Mine is a 4.8KW system consists of 16 LG300-N1C, Solaredge optimizers, SE6000A-US inverter and IronRidge mounting HW. Installation took 5 days including city inspection this morning. Here are some pictures I took on 2nd and 4th day.
DSC_0116 (800x532).jpgDSC_0120 (800x532).jpg
All the posts had double flashing
DSC_0117 (800x532).jpg
Some vents were replaced with low profile ones
DSC_0121 (800x532).jpgDSC_0122 (800x532).jpg
Final product
IMG_20140928_123252 (800x592).jpg
Inverter and EV charger
Now I need to wait for SDGE to come out to do a final inspection before it can be switched on.