Equipment (12 kW)
40 x LG300N1C-B3
40 x SolarEdge P400 Optimizers
1 x SE11400-US Inverter
Array:
187 deg (Just slightly West of South)
30 deg elevation
8 panels wide (landscape) x 5 panels high
Electrical to sub panel (at array), Installed by homeowner.
Predicted Timeline:
Day 1: Dig holes
Day 2: Pour concrete
Day 3: Assemble Array, Panels
Day 4: Finish any items not completed in Days 1-3
Day 1: Installer arrived, staked out the array, Drilled holes, and called for underground inspection
2 people x 3.5 hours
I'll add photos below:
Day1_as.jpgDay1_bs.jpgDay1_cs.jpg
40 x LG300N1C-B3
40 x SolarEdge P400 Optimizers
1 x SE11400-US Inverter
Array:
187 deg (Just slightly West of South)
30 deg elevation
8 panels wide (landscape) x 5 panels high
Electrical to sub panel (at array), Installed by homeowner.
Predicted Timeline:
Day 1: Dig holes
Day 2: Pour concrete
Day 3: Assemble Array, Panels
Day 4: Finish any items not completed in Days 1-3
Day 1: Installer arrived, staked out the array, Drilled holes, and called for underground inspection
2 people x 3.5 hours
I'll add photos below:
Day1_as.jpgDay1_bs.jpgDay1_cs.jpg
Comment