Hi there, any advice would be appreciated for a new member here with camp off grid in woods of Maine, ,
I have 10 mighty max 12v 100ah deep cycle sealed lead acid batteries, Renogy 3000W pure sine wave inverter, weideer 4 string PV combiner box, 2 200 W Newpowa monocrystalline panels,2 175W NewPowa mono panels and a renogy rover 40amp mppt controller, batteries in parallel, keeping the setup simple.
i need assistance in taking the next step in adding shunts , bus bars and a battery balancer on to the system, with 10 batteries and limited sun at times here in Maine, I feel that not all the batteries ,especially at the end of the run are getting enough stored power
are there videos , articles out there to assist me with splitting the 10 batteries into 2 runs of 5 to equally charge them.
Many Thanks
I have 10 mighty max 12v 100ah deep cycle sealed lead acid batteries, Renogy 3000W pure sine wave inverter, weideer 4 string PV combiner box, 2 200 W Newpowa monocrystalline panels,2 175W NewPowa mono panels and a renogy rover 40amp mppt controller, batteries in parallel, keeping the setup simple.
i need assistance in taking the next step in adding shunts , bus bars and a battery balancer on to the system, with 10 batteries and limited sun at times here in Maine, I feel that not all the batteries ,especially at the end of the run are getting enough stored power
are there videos , articles out there to assist me with splitting the 10 batteries into 2 runs of 5 to equally charge them.
Many Thanks
Comment