This 24V off-grid PV system pre-dates me by many years but I've finally got around to starting some upgrades.
Currently, there are 8 x 75W panels (2 strings of 4) feeding into a Xantrex 150V/60A SCC as shown here:
arrays.jpg
Here's a pic of the combiner box:
combiner-box.jpeg
I have 3 x 350W panels to replace the lower 4 x 75W panels and will feed them directly into my new Victron 150V/60A SCC.
The existing 4 x 75W panels in the upper string will stay connected to the Xantrex SCC until I get around to replacing those panels, too.
So, there will be two independent 3 x 350W strings feeding two 150V/60A SCC's.
Questions:
- What is the correct equipment disconnect sequence for me to safely disconnect the lower string?
- Once I've disconnected the lower string from the combiner box is it ok to leave the upper string of 4 x 75W panel's connections in the combiner box (I would remove the box once new panels are also installed on upper mount)?
Currently, there are 8 x 75W panels (2 strings of 4) feeding into a Xantrex 150V/60A SCC as shown here:
arrays.jpg
Here's a pic of the combiner box:
combiner-box.jpeg
I have 3 x 350W panels to replace the lower 4 x 75W panels and will feed them directly into my new Victron 150V/60A SCC.
The existing 4 x 75W panels in the upper string will stay connected to the Xantrex SCC until I get around to replacing those panels, too.
So, there will be two independent 3 x 350W strings feeding two 150V/60A SCC's.
Questions:
- What is the correct equipment disconnect sequence for me to safely disconnect the lower string?
- Once I've disconnected the lower string from the combiner box is it ok to leave the upper string of 4 x 75W panel's connections in the combiner box (I would remove the box once new panels are also installed on upper mount)?
Comment