20 FETs just arrived in the mail, will take a few days to build up the 3000 watt pure sine power unit, need to aquire a tube of heat transfer paste before final assembly, I think lack of heat transfer played a role in the past meltdown, by the numbers it should have been impossible for 1800 watts worth of panels to fry a 2000 watt board, also plan to reconfigure three strings of 9 solar panels 2700 watts worth to feed the 3000 watt pure sine power unit.
Will see you shortly with pictures of the new power system recharging the KIA Soul EV, really need this to work, if I don't kill the power boards in the next test I may leave the new 2500+ system in place and just replace
panels back to the older Gopower system.
Will see you shortly with pictures of the new power system recharging the KIA Soul EV, really need this to work, if I don't kill the power boards in the next test I may leave the new 2500+ system in place and just replace
panels back to the older Gopower system.
Comment